Project file:
- Shoreditch Bridge
- New York Times Tower
- Welsh Assembly
- Rheola Bridge
- English Institute of Sport
- Reebok Stadium
- M & S New HQ
- Aintree Racecourse
- Masalani Bridge
- Paul Brown Stadium
- Farnborough Airship Hanger
- Chiswick Park
- Lloyds-TSB
- The Forum
- Pollok Bus Station, Glasgow
- Southampton Magistrates Court
- Dynamic Earth
- Blythe Bridge
- Paddington Rail Station
- Royal Victoria Dock Bridge
- Stratford Station
- Rotherham Markets
- Newcastle Central Station
DST 520 specification:
Project file:
Newcastle Central Station

Project:
Newcastle Central Station, UK
Architect:
Railtrack
Structural engineer:
Waterman BBT
Steelwork contactor:
Tubemasters & Westburys
Project details:
A major redevelopment of the Victorian central station in Newcastle. Railtrack have completed major structural work within the original barrel roofed station structure. The two ends of the station have now been replaced with structural glass façades to produce a glass wall 24m long, 5.8m high supported on a tubular truss fabricated from 355mm diameter CHS.
All of the tendons and the fabricated plate connections were manufactured by Daver Steels. The bar tendons range from M16 to M42 and were all galvanised.
Horizontal tendons were supplied in 16 and 19mm dia galvanised cable were also supplied. Special T headed pins with end washers retained by cir-clips were machined. The plate connections were fabricated with threaded machined connections to take the stainless steel spider glazing connection.
All of the tendons and the fabricated plate connections were manufactured by Daver Steels. The bar tendons range from M16 to M42 and were all galvanised.
Horizontal tendons were supplied in 16 and 19mm dia galvanised cable were also supplied. Special T headed pins with end washers retained by cir-clips were machined. The plate connections were fabricated with threaded machined connections to take the stainless steel spider glazing connection.

structural bar systems
