Project file:
- Shoreditch Bridge
- New York Times Tower
- Welsh Assembly
- Rheola Bridge
- English Institute of Sport
- Reebok Stadium
- M & S New HQ
- Aintree Racecourse
- Masalani Bridge
- Paul Brown Stadium
- Farnborough Airship Hanger
- Chiswick Park
- Lloyds-TSB
- The Forum
- Pollok Bus Station, Glasgow
- Southampton Magistrates Court
- Dynamic Earth
- Blythe Bridge
- Paddington Rail Station
- Royal Victoria Dock Bridge
- Stratford Station
- Rotherham Markets
- Newcastle Central Station
DST 520 specification:
Project file:
Dynamic Earth

Project:
Dynamic Earth Project, Edinburgh, UK
Structural engineer:
Arups
Steelwork contactor:
S H Structures Ltd
Project details:
A spectacular tension structure canopy - housing the Dynamic Earth Project, a Millennium Commission exhibiting the natural and physical forces on planet earth.
Long bar tendons were supplied in M24, M30, M36, M42 & M48 diameters. The bars were detailed with a very high paint specification, with differing sectors painted in various final colours. The tendons were supplied as plugged components, allocated and identified by sector for painting. The bar threads are tape protected for painting. Painting and final tendon assembly was by the steelwork contractor.
Long bar tendons were supplied in M24, M30, M36, M42 & M48 diameters. The bars were detailed with a very high paint specification, with differing sectors painted in various final colours. The tendons were supplied as plugged components, allocated and identified by sector for painting. The bar threads are tape protected for painting. Painting and final tendon assembly was by the steelwork contractor.

structural bar systems
