Project file:
- Shoreditch Bridge
- New York Times Tower
- Welsh Assembly
- Rheola Bridge
- English Institute of Sport
- Reebok Stadium
- M & S New HQ
- Aintree Racecourse
- Masalani Bridge
- Paul Brown Stadium
- Farnborough Airship Hanger
- Chiswick Park
- Lloyds-TSB
- The Forum
- Pollok Bus Station, Glasgow
- Southampton Magistrates Court
- Dynamic Earth
- Blythe Bridge
- Paddington Rail Station
- Royal Victoria Dock Bridge
- Stratford Station
- Rotherham Markets
- Newcastle Central Station
DST 520 specification:
Project file:
M & S New HQ
Project:
M & S New HQ, Paddington, London, UK
Structural engineer:
Arups
Steelwork contactor:
Jakem
Project details:
Marks and Spencers have recently moved their head office from Baker Street to purpose built hi tech offices in the revitalised Paddington Bason in London.
Daver Steels supplied Swiss steel work fabricator Jakem with 160 number M90 tendons that brace the two main atriums. A specification of finish was required with all castings to have machined edges and supplied with a complete paint specification including top coat.
Daver Steels also supplied expertise and equipemnt to allow all 8 tendons to be stressed to 600kN simultaneously in each bay.
Daver Steels supplied Swiss steel work fabricator Jakem with 160 number M90 tendons that brace the two main atriums. A specification of finish was required with all castings to have machined edges and supplied with a complete paint specification including top coat.
Daver Steels also supplied expertise and equipemnt to allow all 8 tendons to be stressed to 600kN simultaneously in each bay.