Project file:
- Shoreditch Bridge
- New York Times Tower
- Welsh Assembly
- Rheola Bridge
- English Institute of Sport
- Reebok Stadium
- M & S New HQ
- Aintree Racecourse
- Masalani Bridge
- Paul Brown Stadium
- Farnborough Airship Hanger
- Chiswick Park
- Lloyds-TSB
- The Forum
- Pollok Bus Station, Glasgow
- Southampton Magistrates Court
- Dynamic Earth
- Blythe Bridge
- Paddington Rail Station
- Royal Victoria Dock Bridge
- Stratford Station
- Rotherham Markets
- Newcastle Central Station
DST 520 specification:
Project file:
Royal Victoria Dock Bridge
Project:
Royal Victoria Dock Bridge, London, UK
Architect:
Lifschultz Davidson
Structural engineer:
Techniker
Steelwork contactor:
Kent Structural Marine
Project details:
A spectacular bar-stayed footbridge, spanning the dock and connecting new apartments with the nearest Docklands Light Railway Station. The bridge has been designed as a very slender structure, representing the sailing heritage of the dock.
Six masts support the bridge varying from almost 30m at one end to 10.6m at the middle. The end of the deck are backstopped to the level of the dock. The bars which support the deck are M30, M42, M56 and M64.
To adjust the tendon length all bars were supplied with a turnbuckle. Daver Steels advised upon and supplied an arrangement for tensioning the bars when installed.
Special tapered lock covers and a jacking frame arrangement enables the load to be relieved from the tendon and the turn buckle to be adjusted.
Six masts support the bridge varying from almost 30m at one end to 10.6m at the middle. The end of the deck are backstopped to the level of the dock. The bars which support the deck are M30, M42, M56 and M64.
To adjust the tendon length all bars were supplied with a turnbuckle. Daver Steels advised upon and supplied an arrangement for tensioning the bars when installed.
Special tapered lock covers and a jacking frame arrangement enables the load to be relieved from the tendon and the turn buckle to be adjusted.

structural bar systems
