Project file:
- Shoreditch Bridge
- New York Times Tower
- Welsh Assembly
- Rheola Bridge
- English Institute of Sport
- Reebok Stadium
- M & S New HQ
- Aintree Racecourse
- Masalani Bridge
- Paul Brown Stadium
- Farnborough Airship Hanger
- Chiswick Park
- Lloyds-TSB
- The Forum
- Pollok Bus Station, Glasgow
- Southampton Magistrates Court
- Dynamic Earth
- Blythe Bridge
- Paddington Rail Station
- Royal Victoria Dock Bridge
- Stratford Station
- Rotherham Markets
- Newcastle Central Station
DST 520 specification:
Project file:
Stratford Station

Project:
Stratford Station, JLE, London, UK
Architect:
Chris Wilkinson Architects
Structural engineer:
JLE
Steelwork contactor:
Tubeworkers
Project details:
A superb glass walled modern station for the Jubilee Line extension. Daver Steels supplied the M48 single and double bar tendons forming the main cross bracing. These included specially machined fork connections to take the parallel bars and connect to the steel truss work. All tendons supplied painted and assembled for incorporation into the works.
Daver Steels also supplied grade 316 stainless steel, specially fabricated vee bars onto a central boss together with fork connections to the under side of the station forecourt.
Daver Steels also supplied grade 316 stainless steel, specially fabricated vee bars onto a central boss together with fork connections to the under side of the station forecourt.

structural bar systems
